Forests where nothing grew.
ARBORAPID™ and PlantGuard establish forests, orchards and crops on arid, saline and degraded land. No irrigation, on projects of 20 to over 100 hectares.

Restoring land at scale is now urgent
Climate shifts have disrupted rainfall across major regions, and agriculture has taken the first hit, made worse by the 2026 fertilizer shortage. At the same time, forests are still cleared for development and mining or degraded by logging, despite regulations such as FLEGT and the EUTR.
Biomatrix technologies are built for large projects on arid, saline and degraded land. All of them are safe for people, wildlife and water, and they work best when applied together.

ARBORAPID™
Patented foil system for new forests and orchards on sands, saline soils, landfills and arid land.
View the field dataPlantGuard
Foliar feeding for crops, orchards and parks that condenses 160–220 g of water per m² of leaf overnight, at only 45–55% humidity.
See the three formulationsWorld of Walnut
Commercial walnut plantations that give their first yield in year six instead of after 15 to 20.
Learn about the programmeSurvival rates, measured in the field
ARBORAPID™ has been deployed on sands, saline soils, municipal landfills, construction debris and technosols, with pioneer species such as poplar, black locust, Siberian elm and wild pear.
Seed-planted walnuts normally take 15 to 20 years. Ash trees reached yield maturity in the same six years.
Reference sites
Each project is documented with coordinates and dated photographs from planting onwards.
- Plandište45.2173, 21.1076Afforestation of degraded and eroded land. Protection against wind erosion and desertification.
- Kanjiža46.0580, 20.0495Afforestation of saline wetland soils with white poplar.
- Veliko Gradište44.7616, 21.5132Afforestation of sandy terrain with black locust.
- Golubac44.6536, 21.6331Afforestation of white sands with black poplar.
Delivered as a turnkey project
The area is covered with patented foil, pits are drilled through it and seedlings are planted. Only site preparation and pit excavation may go to approved local subcontractors, under our supervision.
- DesignEngineering and project design for your site and species.

- Planting materialSeedling selection that screens out hidden root diseases.

- Field worksSite preparation, foil installation and planting.

- SupervisionOversight through every stage until the plantation is established.

Discuss your project
Authorised representatives in Australia, Croatia, the Czech Republic, Serbia and Slovakia. For other territories, contact the head office.